Conveyor belt splicing: hot and cold vulcanised and mechanical splices, how a stepped splice is made, splice faults, and the register that finds them early

Conveyor belt splicing from the maintenance side: hot vulcanised splices for fabric and steel cord belts, cold vulcanised splices and mechanical fasteners compared, how a stepped fabric splice is set out, cut, laid up and cured, the faults that show a splice going bad, and a splice register with length measured at each inspection. With a plan and section drawing of a stepped splice.

Bulk Materials HandlingReliability Engineering
Line drawing of a stepped four ply conveyor belt splice in plan and section, with the bias, the three steps, staggered butt joints and the reference marks for measuring splice length

Key takeaways

  • A splice is the weakest part of a conveyor belt, and most belt failures that are not damage start at one.
  • Hot vulcanised splices are the strongest and the only choice for steel cord belts. Cold vulcanised and mechanical splices trade strength for speed and simplicity.
  • A fabric splice is cut in steps, one fewer than the number of plies, on a bias so it does not meet a pulley all at once.
  • Square to the centreline, clean and dry, and cured for the full time: those three decide whether a vulcanised splice lasts.
  • Number every splice, measure its length between fixed marks at each inspection, and record failures against it. Growth in length is the early warning.

A belt has three splices. Two of them have run for years. The third was made in the rain at the end of a long shutdown, cured for less than the full time, and is now lifting at its leading step. Nobody knows which one it is, because none of the splices are numbered, and the first sign anyone sees will be the belt parting under load.

This guide covers conveyor belt splicing from the maintenance side: hot vulcanised, cold vulcanised and mechanical splices, how a stepped fabric splice is made, the faults that show a splice going bad, and the register and inspection that find them early. It sits beside the guides to conveyor belt tracking and conveyor pulleys and lagging. The dimensions shown are illustrative. The real ones come from the belt maker's splice instructions.

Types of belt splice

The splice is chosen by the belt construction, its tension, the time and conditions available, and what a failure would cost. Steel cord belts are always hot vulcanised. Fabric belts on main conveyors are usually hot vulcanised too, with cold splices and fasteners used on lighter belts and for repairs.

TypeHow it is madeSuits and limits
Hot vulcanised, fabric beltThe plies are cut back in steps, bonded with uncured rubber and cured in a heated pressThe strongest and smoothest fabric splice, needs a press, power, a dry site and several hours
Hot vulcanised, steel cord beltThe cords from each end are laid between each other in a set pattern, embedded in rubber and cured in a pressThe only option for steel cord belts, laid out to the belt maker's splice design for that rating
Cold vulcanisedThe plies are stepped as for a hot splice and bonded with a cold curing adhesive, with no pressQuicker to set up, suits lighter fabric belts, and is sensitive to humidity, cleanliness and cure time
Mechanical fastenersHinged or plate fasteners are bolted or stapled across the squared belt endsFast and needs little equipment, so suits repairs and short belts, but is weaker, lets fines through and is hard on scrapers

How a stepped fabric splice is made

In a fabric belt the strength is in the plies. A stepped splice cuts each end back one ply at a time so that the plies of the two ends overlap in steps, and the load passes from ply to ply through the rubber between them. A four ply belt has three steps. The whole splice runs on a bias across the belt.

The quality of a vulcanised splice is decided before the press closes. Squareness to the centreline, clean and dry surfaces, and the right materials matter more than anything done afterwards, which is why splicing is best done under cover, by a trained crew, with time allowed in the shutdown plan.

STEPPED FABRIC BELT SPLICE · PLAN AND SECTION · ILLUSTRATIVEPLANCENTRELINEEND AEND BBIASMARK AMARK BA TO B MEASURED EACH INSPECTIONSPLICE LENGTHSECTION ON CENTRELINEEND AEND BTOP COVERPLIES 1 TO 4BOTTOM COVERSTEPSTEPSTEPNEW COVER RUBBERBUTT JOINTS STAGGEREDSPL-0101 · STEPPED SPLICE, BIAS AND STEPS · REV A
Fig. 1 · An illustrative stepped splice in a four ply fabric belt, in plan and in section, with the bias, the steps and the reference marks for measuring splice length
StepWhat happensWhat to watch
Set upClamp both ends, mark the belt centreline over a long length on each side, and set out the splice length and biasA splice that is not square to the centreline makes the belt shift sideways at every pass
Cut the stepsCut through one ply at a time and peel it back, one step per ply less one, without nicking the ply belowA cut into the next ply is a weak line across the splice
Buff and cleanBuff the exposed plies and cover edges to a clean, dry, slightly rough surfaceContamination and moisture are the usual causes of a splice that lets go
Lay upApply cement and tie gum, bring the ends together on the centrelines, and fill the cover with new rubberSteps meet without gaps or overlaps, and the joint is no thicker than the belt
CureClose the press and hold the temperature and pressure for the time the belt thickness needs, then cool under pressureUnder cure leaves a weak bond, and opening the press hot can blister the cover
Finish and recordTrim, check squareness and thickness, and record the splice in the registerEach splice has a number, a position on the belt, a date, a type and a crew

A splice that is not square to the centreline makes the belt run off at the same point every revolution. No idler adjustment fixes it.

Splice faults

Splice faults usually start small. A step edge lifts, a cover blisters, a fastener works loose, or the splice slowly lengthens as the bond creeps. Caught early, a splice can be repaired or remade in a planned stop. Missed, it parts under load, often taking structure, chutes and a long downtime with it.

FaultLikely causeWhat it looks like
Step lifting or ply separationContamination, moisture or under cure in the bondA ply edge lifting at the leading step, often at the belt edges first
Splice not squareEnds cut or joined off the belt centrelineThe belt runs off at the same point every revolution, then comes back
Cover blistersTrapped air or solvent, or the press opened before coolingRaised patches on the cover over the splice
Splice growing in lengthThe bond creeping under tension, the start of failureThe distance between reference marks either side of the splice increases
Fastener pull out or broken platesFasteners worn, the wrong size for the belt, or pulleys too small for themMissing or loose fasteners, a torn belt end behind the plates
Cord pull outLow cord adhesion or a splice made short of the design lengthCords exposed or the splice lengthening on a steel cord belt

Inspecting splices and keeping the register

A splice register turns splice condition into something that can be trended. Each splice gets a number and a position measured from a fixed mark, so it can be found on the belt, and each one has its type, date and crew recorded. Inspections on the conveyor route record its condition and length, and failures go into the maintenance log against the splice. Over time the register shows which splice types, conditions and crews last, which is the evidence for the next splicing contract.

TaskWhat it involvesWhen
Splice registerEvery splice numbered, its type, date, crew and distance from a fixed markKept current, and updated at every new splice or belt change
Visual checkSteps, edges, cover and fasteners at each spliceOn the conveyor route, with the belt stopped and isolated or from a safe viewing point
Splice lengthThe distance between paint marks or studs either side of each spliceRecorded each inspection, so growth shows as a trend
Fastener checkFasteners tight, plates intact, the belt end behind them soundEvery inspection on a belt with mechanical splices
Scraper and pulley contactScraper blades not catching the splice, no damage from small pulleysWhen scrapers are changed, and after any new splice
Belt and splice historyEach failure recorded against the splice and belt in the maintenance logReviewed when choosing splice type and contractor

Common mistakes

  • Splicing in wet or dusty conditions without cover, and curing short to make the end of a shutdown.
  • Setting the splice out without a long centreline on each belt end.
  • Cutting into the ply below while stepping the belt.
  • Leaving mechanical fasteners in place as a permanent repair on a main belt.
  • No splice numbers, so a failing splice cannot be tracked or found.
  • Not measuring splice length, so growth goes unnoticed until the splice parts.
  • Scrapers set so hard that they catch splices and fasteners.

Common questions

What is conveyor belt splicing?

Belt splicing is joining the two ends of a conveyor belt to make it endless, when a belt is installed, replaced in sections or repaired. The joint is either vulcanised, where the layers of the belt are bonded with rubber under heat and pressure or with a cold curing adhesive, or mechanical, where metal fasteners are fixed across the belt ends.

What is the difference between hot and cold vulcanising?

Hot vulcanising cures uncured rubber between the belt layers in a heated press, which gives the strongest bond and suits steel cord and high tension fabric belts. Cold vulcanising bonds the layers with an adhesive that cures at ambient temperature, so no press is needed, but the bond is more sensitive to humidity, cleanliness and cure time and is generally used on lighter fabric belts.

When should mechanical belt fasteners be used?

Mechanical fasteners suit short belts, lighter duties and emergency repairs, because they can be fitted quickly with simple tools and no curing time. They are weaker than a vulcanised splice, let fines through onto the return run, need pulleys large enough for the fastener size, and are hard on belt scrapers. Many sites use them to get running again and plan a vulcanised splice for the next stop.

Why is a belt splice cut on a bias?

A bias means the splice runs across the belt at an angle, so it enters a pulley gradually instead of along its whole width at once. That spreads the bending stress and the impact as the splice passes pulleys and scrapers. The bias and step lengths for a given belt come from the belt maker's splice instructions.

How do you know a belt splice is failing?

Common signs are a ply edge lifting at a step, blisters in the cover, missing or loose fasteners, and the splice growing in length. Measuring the distance between marks either side of each splice at every inspection shows growth as a trend, often before anything is visible. A belt that wanders at the same point every revolution may have a splice that is not square.

Key terms

Plain-language definitions from our glossary for the concepts this article leans on.

Standards and further reading

Related case studies and tools

Related reading

Running plant like this?

Enco helps the teams that run and maintain it, with maintenance strategy, asset data and planning, condition monitoring and reporting software, and engineering studies. See the work we have delivered, or tell us what you are dealing with.