Skip to content
November 2026 · 7 min read

Pareto analysis for maintenance: making a Pareto chart, the 80/20 rule, a worked downtime example, what to rank by, and drilling down to causes

Pareto analysis for maintenance: building a Pareto chart with ranked bars and a cumulative line, the 80/20 rule as a rule of thumb, a worked example from a quarter of downtime where three items of twenty cause two thirds of the hours, ranking by events, hours, cost or consequence, drilling down to causes, and turning the result into action that shows on the next chart.

Reliability EngineeringMaintenance Strategy
Line drawing of a Pareto chart of downtime by equipment with ranked bars, a cumulative share line and the 80 per cent mark, beside a breakdown of the worst item by cause

Key takeaways

  • Pareto analysis ranks causes from largest to smallest so effort goes to the few that matter most. In maintenance that usually means downtime or cost by equipment or failure mode.
  • A Pareto chart shows the ranked bars with a cumulative line. The vital few are where the line bends, whether that is 80 per cent or not.
  • Rank by what matters. Counting work orders favours nuisances, while hours lost or cost shows where production and money go.
  • One level down is usually where the action is: a second Pareto of the worst item, by failure mode or cause.
  • Run it again next period. If the chart has not changed, the action did not work.

A maintenance meeting has forty open problems on its list, and each gets five minutes. A quarter's downtime, ranked, would have shown that three machines caused two thirds of the lost hours, and that on the worst of them one cause, a liner change that always overruns, caused almost half.

This guide covers Pareto analysis for maintenance: building a Pareto chart, a worked example from a quarter's downtime, choosing the measure to rank by, drilling down to causes, and turning the result into action. The example is fictional, with 190 hours of downtime across twenty items.

A worked example

The quarter's downtime log is totalled by equipment and sorted. The crusher, the overland conveyor and the product screen account for about 69 per cent of the hours lost, and adding the apron feeder takes it to 79 per cent. Fourteen other items share the last 9 per cent, grouped as Other.

PARETO CHART · DOWNTIME BY EQUIPMENT · FICTIONAL QUARTERHOURS LOSTCUMULATIVE02040600%50%100%80%62CR-0141CV-0328SC-0219AF-0114PP-3109SR-0117OTHER69%THE VITAL FEW: THREE OF TWENTY ITEMS, ABOUT TWO THIRDS OF THE HOURSCR-01 BY CAUSE, HOURSLINER CHANGE OVERRUN27BLOCKED DISCHARGE CHUTE16TRAMP METAL TRIPS11HYDRAULIC SETTING8TWO CAUSES, 70% OFTHE CRUSHER'S HOURSPAR-0101 · RANKED HOURS, CUMULATIVE SHARE, DRILL DOWN · REV A
Fig. 1 · A fictional Pareto chart of a quarter's downtime by equipment, with the cumulative share line and the 80 per cent mark, and a second level Pareto of the primary crusher by cause
EquipmentHoursShareCumulative
CR-01, Primary crusher6233 per cent33 per cent
CV-03, Overland conveyor4122 per cent54 per cent
SC-02, Product screen2815 per cent69 per cent
AF-01, Apron feeder1910 per cent79 per cent
PP-310, Mill discharge pump147 per cent86 per cent
SR-01, Stacker reclaimer95 per cent91 per cent
Other, Fourteen other items179 per cent100 per cent

Three items out of twenty caused more than two thirds of the downtime. Those three get the effort first.

One level down

The top bar is a starting point, not an answer. A second Pareto of the crusher's 62 hours by cause shows that liner change overruns and a blocked discharge chute account for 70 per cent of it. Those are specific enough to act on: plan the liner change better, and look at the chute. Each could become a five whys or a root cause analysis.

Crusher causeHoursShare
Liner change overrun2744 per cent
Blocked chute at discharge1626 per cent
Tramp metal trips1118 per cent
Hydraulic setting faults813 per cent

How to do it

A Pareto analysis needs consistent data more than clever charting. Downtime coded to equipment and cause in a downtime log, or work orders closed with failure codes in the CMMS, can be ranked in minutes. Data without codes has to be read and sorted by hand first.

StepWhat it involvesWatch for
Ask one questionWhich equipment lost the most production last quarter, or which failure modes cost mostA clear question decides the measure and the categories
Choose the measureHours lost, cost, number of events, or a consequence scoreRank by what matters, which is rarely the count of work orders
Choose the categoriesEquipment, failure mode, cause, crew or shift, at one level of the hierarchyMixing levels hides the answer
Collect the dataFrom the downtime log or CMMS history, for a long enough periodCodes recorded consistently matter more than volume
Sort and accumulateLargest first, with each bar's share and the running totalGroup the long tail as Other, placed last
Draw and readBars for each category, a line for the cumulative shareThe vital few are where the line bends
Drill downA second Pareto of the top category, by cause or failure modeOne level down is usually where the action is
Act and repeatFix the top causes, then run the same analysis next periodThe chart should change, or the action did not work

What to rank by

The same data can give different answers depending on the measure. Ranked by number of events, nuisance trips top the chart. Ranked by hours lost, the long breakdowns do. Ranked by cost, the expensive repairs do. Choose the measure that matches the question, and where safety or environmental consequence matters, rank by a consequence score from the criticality matrix.

MeasureShowsWatch for
Number of eventsWhich items fail most oftenFavours many small nuisances over one big failure
Downtime hoursWhich items cost the most production timeCount only downtime that stopped or slowed production
CostWhere the maintenance money goesIncludes labour, parts and contractors, not lost production unless added
ConsequenceProduction, safety and environmental impact togetherNeeds a consistent consequence scale, such as the criticality matrix

Turning it into action

A Pareto chart earns its place when it changes what the team works on. The top items become bad actors with an owner and a plan, the plan is tracked, and the same chart is produced next period. If the crusher is still at the top after its liner change has been fixed, the drill down needs another look. Over time the chart should flatten, as the biggest causes are removed and the remaining downtime spreads across more, smaller causes.

Common mistakes

  • Ranking by number of work orders when hours or cost matter more.
  • Mixing levels, such as whole conveyors against individual idlers.
  • Stopping at the top bar without drilling down to causes.
  • Too short a period, so one event dominates the chart.
  • Inconsistent codes, so the same cause appears under three names.
  • Treating 80/20 as a law and ignoring a split that is different.
  • Producing the chart once instead of every period.

Common questions

What is Pareto analysis?

Pareto analysis is a way of ranking the contributors to a problem from largest to smallest, so attention goes to the few that account for most of the effect. It is named after the economist Vilfredo Pareto and was applied to quality by Joseph Juran, who called it separating the vital few from the useful many. In maintenance it is used to find the equipment, failure modes or causes behind most downtime or cost.

What is a Pareto chart?

A Pareto chart is a bar chart with the categories sorted from largest to smallest, and a line showing the cumulative share of the total. The bars show which categories are biggest, and the line shows how quickly the total builds up, so the vital few are easy to see.

What is the 80/20 rule?

The 80/20 rule is the observation that about 80 per cent of an effect often comes from about 20 per cent of the causes. It is a rule of thumb, not a law: the split might be 70/30 or 90/10. The point is that effects are usually concentrated in a few causes, and a Pareto chart shows where.

How do you make a Pareto chart?

Choose the measure, such as downtime hours, and the categories, such as equipment. Total the measure for each category over the period, sort from largest to smallest, and work out each category's share and the running cumulative share. Draw a bar for each category in order with the long tail grouped as Other at the end, and plot the cumulative share as a line against a second axis from 0 to 100 per cent. Excel and most reporting tools have a Pareto chart type.

How is Pareto analysis used in maintenance?

It finds the bad actors: the equipment, failure modes or causes behind most of the downtime or cost. Typical uses are ranking a quarter's downtime by equipment, ranking maintenance cost by asset, ranking failure modes on a critical machine, and choosing which failures get a root cause analysis. Repeating it each period shows whether actions are working.

Key terms

Plain-language definitions from our glossary for the concepts this article leans on.

Standards and further reading

Related case studies and tools

Related reading

Working through something like this?

See how we approach these initiatives, or tell us what you are dealing with.