Skip to content

Asset management consulting, Perth

Asset management, reliability and work management consulting for mining and industrial operations, from consultants who have done the work they advise on.

Enco's asset management consultants work on physical assets: the plant, fleets, rail and infrastructure an operation depends on. We help teams decide what their assets need and get it done, from the strategic asset management plan down to the maintenance strategy, the master data and the weekly schedule. We work alongside your planners, supervisors and engineers, and leave processes and systems your team owns.

This is physical asset management, the discipline of ISO 55000, not investment or IT asset management. We are not a certification body, so we help organisations prepare for ISO 55001 certification and leave the audit to an accredited certifier.

What we help with

The first five each link to a case study of work we have delivered, described without naming the client.

Asset management planning

The strategic asset management plan and the asset management plans beneath it, with objectives, levels of service and criticality turned into a costed plan that holds.

Asset management planning →

Reliability and maintenance strategy

Maintenance strategies decided from criticality and how each asset fails, using FMECA and reliability centred maintenance logic where the asset deserves it.

Reliability engineering and asset strategy →

Asset hierarchy and master data

Registers, hierarchies, maintenance plans and master data rebuilt so planning, costing and reliability decisions can stand on them, without losing history.

Rebuilding asset hierarchies and master data →

Work management, planning and scheduling

Work through one path, planned before it is scheduled, a weekly schedule that holds, and the measures that show whether it does.

Work management and scheduling uplift →

Operational readiness

New assets ready to run and maintain at handover: spares, master data, maintenance strategies, procedures and the CMMS build.

Operational readiness for a new asset →

Resourcing, training and coaching

Experienced planners, reliability engineers and asset management practitioners to fill a gap while capability is built, and coaching so the team can carry it on.

How we work →

How an engagement runs

Every engagement starts with the operation as it runs, not with a template. The method behind each step is set out in our guides to what asset management is and maintenance management.

  1. Understand

    Time on site with the people who run and maintain the assets, and a look at the plans, data and systems they use.

  2. Assess

    Where practice stands against what the operation needs, and against ISO 55001 where that matters, with the gaps sized and ranked.

  3. Build

    Plans, strategies, data and processes built with your team, starting with the assets and gaps that matter most.

  4. Embed

    Coaching, handover and a small set of measures, so the improvement keeps going after we leave.

ISO 55001, with or without the certificate

Many operations want the discipline of ISO 55001 and some need the certificate. Either way the work is the same: a system that makes better asset decisions and can show it. We help with the parts that take longest.

  • A gap assessment against the clauses, sized and ranked, before an audit date is committed.
  • The strategic asset management plan and the line of sight from objectives to work.
  • Criticality, risk and the asset information the decisions stand on.
  • Internal audit and management review that change decisions, which is where auditors most often find weakness.

Why work with us

Done the work we advise on

Our consultants have worked on site and inside operations like yours, so recommendations account for how a shift actually runs, and delivery continues past the report.

Engineering, data and software in one team

When the answer needs a data fix, a report or a small application, the same team can build it, rather than handing a recommendation to someone else.

Perth based, Australian sites

Based in West Perth, in the same time zone as most of the mining and resources operations we work with, and on the same flights. Site visits are part of the method.

Alongside your team

We work with your planners, supervisors and engineers, coach through the change, and hand over processes and systems your team owns.

Who it suits

  • An operation with a busy maintenance crew, a growing backlog and too much break-in work.
  • An asset owner preparing for ISO 55001, a regulator's review or a tender that asks for an asset management system.
  • A site with a CMMS full of data nobody trusts, where planning and reliability decisions need a sound register and hierarchy.
  • A project bringing a new asset online that needs to be ready to run and maintain at handover.
  • A team that needs experienced planners or reliability engineers while it builds its own capability.

Common questions

What does an asset management consultant do?

An asset management consultant helps an organisation get more value from its physical assets: setting objectives and plans, deciding maintenance strategies, improving the data decisions stand on, and fixing how work is planned and done. The good ones work alongside the team and leave capability behind, not just a report.

Do you certify organisations to ISO 55001?

No. Certification is done by accredited certification bodies, and a consultant who helps build a system should not also certify it. We help organisations prepare, from the gap assessment to the evidence an auditor samples. The certification guide explains the process.

Do you only work with Perth companies?

No. We are based in West Perth and work with operations across Western Australia and Australia, on site and remotely.

Can you provide planners or reliability engineers?

Yes. Where a gap needs filling while capability is built, we can supplement your team with experienced practitioners for as long as it takes, and coach your own people into the role.

Will we need a new CMMS?

Rarely. Most of the gains come from how the CMMS you already run is configured and used: the hierarchy, the master data, the statuses and the work process. We work inside the system you have, and our software team can build what it does badly when that is the better answer.

How long does an engagement take?

It follows the scope. A gap assessment or a strategy review is a matter of weeks, while a work management uplift or a master data rebuild runs alongside the operation for longer. We scope a first stage before anything larger is committed.

Tell us about your assets

A few lines on the operation and what you want to change is enough to start. We will come back with questions, then a proposal.

We'll only use your details to respond. No spam, ever.